FREE Shipping $99 + on P SCROG products

4x4 & 2x4 Assembly Guide

P SCROG 4x4

Unwrap the aluminum frame pieces and place like pieces together on a rug, carpet or similar hard, but protected surface. Take one channel piece and lay it in a position with the channel opening facing right Channel Aluminum. Place the H-Bar Aluminum H-Bar piece roughly 21" parallel to the 1st channel piece with colored dots facing up. Place the 2nd channel piece on the right of the H-Bar roughly 21" parallel to it, with the channel opening facing left Channel Aluminum.

channel cross section   H bar cross section  channel cross section

Take each of the angle pieces  and place them on top of the ends of the three pieces above with their flat perpendicular edge facing outboard and corresponding color dot facing the H-Bar.

H bar and angle match
Match colored dots

4x4 frame assemblyAlign 6 holes

Align the 6 holes and insert one screw into each hole and secure with wing nuts. Hand tightening is sufficient.

align holes

apply wing nuts

Take the 4 screens and put the leading edge of each screen into the channel slots.

insert screen

Gently bow the screens enough to put each opposing screen edge into the H-Bar slots. Install all 4 screens in the same manner.

insert screen

 Position the screens to form a perfect square.

4x4 final assembly

Install assembled frames as the grow space environment requires. Call SCROGGER for free consultation on possible methods at 512-428-6028.

 

P SCROG 2x4

Unwrap the aluminum frame pieces and place like pieces together on a rug, carpet or similar hard, but protected surface. Take one channel piece and lay it in a position with the channel opening facing right Channel AluminumPlace the 2nd channel piece roughly 21" to the right of the first piece with channel opening facing left Channel Aluminum.

Take each of the angle pieces  and place them on top of the ends of the 2 channels above with their flat perpendicular edges facing outboard. 

Align the 4 holes and insert one screw into each hole and secure with wing nuts. Hand tightening is sufficient.

align holes

tighten holes

Take the 2 screens and put the leading edge of each screen into the channel slots.

insert screen edge

Gently bow the screens enough to put each opposing screen edge into the channel openings.

secure second edge

 Position the screens. 

final 2x4 assembly

Install assembled frames as the grow space environment requires. Call SCROGGER for free consultation on possible methods at 512-428-6028.

 

Subscribe to SCROGGER mailing list